CREUS Engineering Ltd. Civil Engineers And Project Managers
Home CREUS Philosophy Project Experience Project Team Contact CREUS Engineering
Project Experience
Current Projects
Multi Phased Developments
Mixed Use Developments
Municipal Infrastructure
Sustainability
Stormwater Management
Environmental Enhancement
Commercial / Institutional Developments
Residential Developments
Residential Infill Projects
Project Management

Municipal Infrastructure

CREUS has worked extensively in the design of municipal infrastructure from lot servicing for infill lots, creating new infrastructure systems for large multi phase developments, pump stations and reservoirs to upgrading and replacing existing municipal infrastructure.

Explore some of CREUS Engineering's current works involving Municipal Infrastructure



The Pier, North Vancouver, BC
Client: Pinnacle International

Description: A 6-acre, mixed use hotel, residential, commercial, public open-space waterfront development on the former Versatile Shipyards lands at the foot of Lonsdale in North Vancouver. This project has involved the design upgrades of existing services in Esplanade and Lonsdale, design and relocation of Esplanade Avenue, replacing sewage pump station as well as all on-site servicing and roads.

CREUS Member Roles: CREUS members were the original, and continue to be, the Engineer of record for all the preliminary and detailed Civil Engineering, sediment and erosion control and Stormwater Management elements of the project. CREUS members managed the tendering and construction of the works and provided inspection for all ongoing and completed civil works.
Kadenwood, Kadenwood Drive, Whistler, BC
Client: Intrawest Resort Developments Group

Description: A 50-acre, residential development on a mountainside neighborhood with tough terrain and stringent visual impact requirements from the municipality. This project has involved the design of all civil services, roads, water and sewage pump stations and upgrading existing reservoir controls and facilities.

CREUS Member Roles: CREUS members were the original, and continue to be, the Engineer of record for all the detailed civil, sediment and erosion control and Stormwater Management elements of the project. CREUS members managed the tender and construction of the works.
Furry Creek, SLRD, BC
Client: Tanac Land Developments and Park Lane Homes

Description: A 1,000-acre mixed use waterfront development on a mountainside with numerous creeks, highway, hydro and rail issues. This project has involved the design of all civil services, roads, pump stations, reservoirs, ski area integration, preliminary approvals and site preparation, construction and inspection.

CREUS Member Roles: A CREUS member was the Development Manager during the early portions of the development. This involved design construction, permits and operational permits for sewage treatment plant with ocean discharge, portable and irrigation water sources, treatment and reservoirs, BC Hydro substation upgrade, fibre optic service to lands and kilometers of pipework and stormwater management features.
Cypress Mountain, West Vancouver, BC
Client: Cypress Bowl Recreations Ltd.

Description: A 1,300-acre Ski Area development with Cypress Provincial Park including Alpine, Nordic and snowplay uses as well as summer hiking and mountain biking. This is one of the top 5 busiest ski areas in BC and is the focus of several local interest groups.

CREUS Member Roles: A CREUS member was the Director of Development during periods of intense capital works. This involved directly managing the design, approvals, tendering, construction management and operational agreements for microfiltration water system, distribution upgrade and reservoir system construction, sewage system connection to municipal system through crown and private lands including storage and timed-release system to address downstream system inadequacies as well as the snowmaking pump stations and piping.
Green River, SLRD, BC
Client: 28165 Yukon Inc.

Description: A 700-acre, residential development on a mountainside neighborhood with tough terrain and encroachments with rivers, highway, rail, hydro and creeks. Project is within SLRD and did not have any existing services upon commencement. This project has involved the design of all civil services, roads, pump stations, reservoirs, bridges, preliminary approvals and site preparation, construction and inspection. We have provided project management for civil works, bridge construction, wetland restoration projects, site development, entry monuments, water system and sewage treatment plant construction.

CREUS Member Roles: CREUS members were the original, and continue to be, the Engineer of record for all the detailed civil, sediment and erosion control and Stormwater Management elements of the project and have managed the tender and construction of the works to date.
Quest University, Squamish, BC
Client: Sea to Sky University Foundation

Description: A 240-acre, mixed use development with a full service university, resident housing, market housing, sports field, wetlands, creek crossings and significant off-site works. This project has involved the design, approvals, construction and inspection of several kilometers of road, the grading and servicing of the core university buildings, grading for resident housing buildings, integration of geothermal heat system, tie into existing water system and add equalization reservoir, pump station and storage water for domestic system.

CREUS Member Roles: CREUS members were the original, and continue to be, the Engineer of record for all the preliminary and detailed civil, sediment and erosion control and Stormwater Management elements of the project and managed the tender and construction of the works, providing inspection for all ongoing and completed civil works.
Croft Road, 1199 Croft Road, North Vancouver, BC
Client: Noort Homes

Description: This project has involved the design, approvals, construction and inspection of the servicing, parking and stormwater works for this 2-lot subdivision.

CREUS Member Roles: CREUS members were the original, and continue to be, the Engineer of record for all the preliminary and detailed civil, sediment and erosion control and Stormwater Management elements of the project.
All Content ©2009 CREUS Engineering Ltd., North Vancouver, BC. All Rights Reserved.
Vancouver Web Design by MW Web Design, North Vancouver BC
Home | CREUS Philosophy | Project Experience | Project Team | Contact Us | Privacy